Specification

  • Brazing torch station
  • Jewellery torch station
  • Central pilot light and Alumina chip forge
  • Manual Air / Gas mix on Torches
  • Automatic start with Pre-Ignition Gas Integrity Check for open torches and appliance gas leaks
  • Compliant to Gas Appliance Directive BS EN203-1

Construction:

Concrete refractory slab work area. Fireproof liners. Robust powder coated steel steel construction.

What's Included:

  • Concrete refractory slab area
  • Fireproof liners
  • Robust powder coated steel construction

Colour & Weight:

Grey / Red - 221kg

Dimensions:

  • W1410mm x D570mm x H1290mm

Power:

240v / 1 phase / 50Hz Natural Gas

Options:

Fume Extraction Hood: Part No.HME0041; Available in LPG and Natural Gas in single and 3 Phase models

Installation:

Gas supply pressure 20mbar; 1/2 inch BSP gas connection; Floor fix & hard wire

Warranty:

12 months Parts and Labour Warranty subject to annual service by an HME Engineer

General Maintenance:

Safety test and HME 12 monthly chip replacement service

Health & Safety Consideration:

Requires fume extraction;; COSHH Regulations; BB81 safe Working Area spacing